Completed"Kapital Bank" OJSC Shirvan branch – construction of a transformer substation
Scope of work
Partner: —
18 km of cable line laid; construction works and supply of various equipment and materials.
CompletedPartner: —
18 km of cable line laid; construction works and supply of various equipment and materials.
CompletedPartner: "Elat Development" LLC
Multi-storey buildings with more than 2,000 apartments; material supply, construction, water and sewerage, electricity and gas supply, fire safety works.
CompletedPartner: "Azmicon" LLC
The 230 MW solar plant covering 550 ha has been commissioned. Our company built 28 transformer stations and erected steel structures, built 9 km of access and 26 km of internal service roads and 12 km of metal fencing, excavated, sanded and bricked/concreted 174 km of cable trenches, and performed more than 1 million m³ of earthworks.
CompletedPartner: "Elat Development" LLC
6,500 m² commercial facility; power supply, earthing and lightning-protection systems.
CompletedPartner: "Nusal Engineering" LLC
Dismantling of more than 300 m of old coastal berthing piers, installation of new piers, welding works.
OngoingPartner: HAS Teknik LLC
315 MW, 900 ha; specialised earthworks, 20 km perimeter, 25 km internal and 5 km access roads, 25 km of metal fencing, cable trench excavation.
OngoingPartner: PMD Projects, Avant Group
3 km access road, 23 km perimeter roads, excavation, sanding and backfilling of cable trenches of various sizes.
OngoingPartner: HAS Teknik LLC
Installation of storm-water drainage lines of various sizes — excavation, backfilling and concrete works.