Projects

Our completed and ongoing projects — energy, residential, commercial and infrastructure.

"Kapital Bank" OJSC Shirvan branch – construction of a transformer substationCompleted

"Kapital Bank" OJSC Shirvan branch – construction of a transformer substation

Shirvan, Azerbaijan · 2012
Client: "Kapital Bank" ASC
Scope of work

Partner: —

18 km of cable line laid; construction works and supply of various equipment and materials.

"Khatai Park" residential complexCompleted

"Khatai Park" residential complex

Baku, Azerbaijan · 2018
Client: "Kontinent İnşaat" MMC
Scope of work

Partner: "Elat Development" MMC

Multi-storey buildings with more than 2,000 apartments; material supply, construction, water and sewerage, electricity and gas supply, fire safety works.

Garadagh Solar Power PlantCompleted

Garadagh Solar Power Plant

Gobustan, Azerbaijan · 2023–2024
Client: "Masdar" Company
Scope of work

Partner: "Azmicon" MMC

The 230 MW solar plant covering 550 ha has been commissioned. Our company built 28 transformer stations and erected steel structures, built 9 km of access and 26 km of internal service roads and 12 km of metal fencing, excavated, sanded and bricked/concreted 174 km of cable trenches, and performed more than 1 million m³ of earthworks.

"Zefir Mall" shopping centreCompleted

"Zefir Mall" shopping centre

Baku, Azerbaijan · 2018–2019
Client: "Paşa Holding", "Kontinent İnşaat" MMC
Scope of work

Partner: "Elat Development" MMC

6,500 m² commercial facility; power supply, earthing and lightning-protection systems.

Repair and restoration of SBS coastal berthing piersCompleted

Repair and restoration of SBS coastal berthing piers

Turkan, Azerbaijan · 2025
Client: "Franklin Offshore Caspian" MMC
Scope of work

Partner: "Nusal Engineering" MMC

Dismantling of more than 300 m of old coastal berthing piers, installation of new piers, welding works.

Banka (Neftchala) Solar Power PlantOngoing

Banka (Neftchala) Solar Power Plant

Neftchala, Azerbaijan · 2025–2026
Client: "Masdar" Company
Scope of work

Partner: HAS Teknik MMC

315 MW, 900 ha; specialised earthworks, 20 km perimeter, 25 km internal and 5 km access roads, 25 km of metal fencing, cable trench excavation.

Bilasuvar Solar Power PlantOngoing

Bilasuvar Solar Power Plant

Bilasuvar, Azerbaijan · 2025–2026
Client: "Masdar" Company
Scope of work

Partner: PMD Projects, Avant Group

3 km access road, 23 km perimeter roads, excavation, sanding and backfilling of cable trenches of various sizes.

Garadagh Solar Power Plant (Phase 2)Ongoing

Garadagh Solar Power Plant (Phase 2)

Gobustan, Azerbaijan · 2025–2026
Client: "Masdar" Company
Scope of work

Partner: HAS Teknik MMC

Installation of storm-water drainage lines of various sizes — excavation, backfilling and concrete works.

No projects found in this category.